A Standing Order, Not a Standing Favour: The Retainer I Pitch Before the Final Invoice
Photo: two business colleagues reviewing documents at a table in a bright UK office, laptop and coffee cups, natural light, via img.freepik.com
The last fortnight of a project is a strange pocket of time. The work is done, the handover document is written, and everyone is being extremely nice to each other because there is nothing left to argue about. That is precisely the moment most of us wave cheerfully, say “let’s keep in touch”, and then spend the next six months watching the client’s name go quiet in the inbox.
I have done the waving. I have also, far more recently, done something else: pitched a small monthly retainer in that window, before the final invoice goes out. Not a large one. Not an “embedded strategic partner” one. Two half-days a month, a fixed fee, thirty days’ notice. It has converted more often than anything else I have tried at the end of a job, and it has quietly become the most useful line on the spreadsheet.
Why the end of a project is the only honest moment to ask
Ask in month three of a six-month project and you are asking someone to picture a future they cannot see yet. Ask three months after you have left and you are a stranger with an invoice attached. Ask in the final fortnight and you are talking to someone who has just watched you solve their problem, still has the bruise from the deadline, and knows exactly how much they do not want to explain all of it to somebody new.
The goodwill is at its peak. The institutional memory is at its peak. And their next problem — the one nobody has scoped yet — is already forming in somebody’s head. You want to be in the room when it lands.
Three signals that the project is ready
I do not pitch this on every project. Roughly half of them do not need it, and pushing it would just be a waste of a good relationship. I look for three things.
They have started asking you things outside the scope. Not big things. A quick “while you’re in there, could you have a look at…” or a forwarded email with “thoughts?” and no context. That is a client who has quietly decided you are their person.
Someone senior has said “we’ll need you again” without naming a date. “We’ll definitely be back in touch in the new year” is not a retainer, but it is an admission that the work is not finished. Take it seriously and put a shape around it.
You have been copied into something you were not invited to. A planning document, a supplier thread, a note about a system you touched. Somebody in that business has added you to the mental org chart. Use it.
If two of those three are true, it is worth a conversation.
Describing it so it does not sound like a subscription to your personality
The mistake I made early on was calling it “ongoing support”. To a client, that phrase means unlimited. To me, it meant unbilled. Now I describe it as a standing monthly conversation with a fixed amount of my time attached — a rhythm rather than a service.
The monthly note, one call, one useful piece of work
The proposal is three lines on a page and I send it as an email rather than a document, because a document invites a document back.
- A forty-five minute call each month, with an agenda the client sets.
- Two half-days of my time for whatever is most useful — a review, some scoping, a second pair of eyes on a supplier.
- A short written note after each call: decisions, risks, what I would do next.
- Anything larger gets quoted separately, as a project, at project rates.
That final bullet is the whole thing. Without it, a retainer becomes unpaid support within about eleven weeks, and you start resenting the client for using something you sold them in good faith.
Pricing it under the procurement radar
The number matters less than where the number sits. Most UK businesses have a threshold — often somewhere around five or ten thousand pounds a year — below which a purchase does not need three quotes and a form. Aim under it. A retainer a line manager can approve on a Tuesday afternoon will actually happen; a retainer that needs a business case gets “revisited next quarter” and then quietly forgotten.
I price two half-days a month at roughly a project day rate with a small loyalty discount — enough that it reads as a considered deal rather than a rounding error. Billed monthly on the first, by standing order, three months minimum, then rolling with thirty days’ notice. Three months is long enough for the rhythm to prove itself and short enough that nobody has to bet the year on it.
The awkward “can we just do it ad hoc?” reply
Some clients will say they would rather simply call you when they need you. Fine — say yes, and then put a day rate on it that is higher than the retainer’s implied rate. Ad hoc should cost more, because it is less predictable and you are holding the space either way. Most people do the maths and pick the retainer inside a fortnight.
What to send, and when
Send it two weeks before the final invoice, in the same email thread as the handover, and keep it short. Something along the lines of: “Before we close this out — would a small monthly slot be useful? Two half-days a month, fixed fee, thirty days’ notice. One-pager attached. Happy to talk it through on Thursday.”
Do not attach a twelve-page services agreement. Do not call it a partnership. Do not apologise for asking.
And if they say no — which plenty will — you have lost nothing at all. You have planted the idea, you have shown that you are thinking about their next problem rather than your next invoice, and you have left the door open in a way that “let’s keep in touch” never quite manages. Which, on reflection, is the whole point of a standing order: it is a small, deliberate habit, not a favour you are hoping will be remembered.